| ▲ | manquer 4 hours ago | |||||||||||||
Vogtle, Hinkley Point C- are all one off constructions and have very expensive regulatory compliance requirements AP1000 (reactor as Vogtle 3/4) in Taishan is estimated to cost $4M-6M /MW compared to $15M/MW+ at Vogtle. if Chinese safety standards seem lax, South Korea does regularly reactors at $4-6M/MW range. Even Flameville 3 in France was significantly cheaper than Hinkley point C (same reactor type), which infamously required some quite ineffective Fish speakers. The EPR2 series (6 reactors) in France is expected to cost considerably less than Flameville did. Key to cheap nuclear - SMR or otherwise is regular construction. SMR makes regular construction more likely as each plant is not a $10-20B+ capex that is a tough sell to tax payers particularly when it inevitably overruns, SMR also potentially have a bit less regulatory hoops to jump through due to their smaller size. | ||||||||||||||
| ▲ | _aavaa_ 3 hours ago | parent | next [-] | |||||||||||||
Are we prepared to play kingmaker and pick one SMR design to standardize on so that those can ride their theoretical learning curve (assuming we get enough buyers)? Because politically that doesn't seem likely, and I think we'll end up with the units that do get contracted to be spread across multiple firms, none of which make it out of the expensive first few units. > Even Flameville 3 in France was significantly cheaper than Hinkley point C Per wikipedia: initial cost estimate €3.3 billion, cost in 2020 (6 years before it was done) €19.1 billion, so 5.8x the budget. Supposed to enter operation in 2012, entered in 2026 "only" 14 years late. These are terrible results. That EPR2 series are "expected" to cost less says absolutely nothing. Flameville 3 was expected to cost 83% less too, and I except that if they swindle people for the money to build it we'll see it'll be just as much of an overrun. The nuclear industry seem absolutely incapable of sticking to a timeline or budget. And any one of these failures should have been disqualifying. But they get to do it over and over again. | ||||||||||||||
| ||||||||||||||
| ▲ | ViewTrick1002 3 hours ago | parent | prev [-] | |||||||||||||
Look at the proposed EPR2 subsidies. It is interest free loans and €100 per MWh on top of that, while assuming large learning effects. They are admitting Flamanville 3 like costs before they have even started building. | ||||||||||||||
| ||||||||||||||