| ▲ | manquer 3 hours ago | |
That is why even Flameville 3 was cheaper than Hinkley point C, not that it was cheap. Flameville 3 is the first reactor for France in 21st century and suffers the frequency problem I am arguing. It was a path finder therefore only one was ever ordered. EPR2 is 6 under construction and France does have a track record of doing it consistently at scale for cheap(by nuclear standards). The Asian giants all do it for cheaper because they build regularly, Japan (post Fukushima policy direction notwithstanding) and South Korea achieve overnight numbers of $5-6M/MW or less, so does China. Regular construction is key, to the industry having a chance, without SMR that is never realistic anymore. | ||