▲ cbg0 6 hours ago

> fusion this time next year.

Aren't most of the remaining problems related to nuclear fusion engineering ones? Like building reactor walls that survive neutron damage.

▲Stevvo 6 hours ago | parent | next [-]

It's a problem of scale and engineering. ITER is already way too big and complex, to the point that it may never be completed. They might turn it on, find a leak and be stuck with a huge paperweight. To have viable power generation you have to go even bigger.

▲red75prime 5 hours ago | parent | next [-]

Nah. The ITER project was prev-gen by the time they began to build it. The project underwent some upgrades, but it's not at the cutting edge. High-temp superconductors and plasma stabilization algorithms allow to make smaller reactors.

▲derac 5 hours ago | parent | prev [-]

Or have stronger magnets, see sparc and arc from commonwealth fusion. Or a different method entirely, see helion.

▲internetter 6 hours ago | parent | prev | next [-]

Why can't AI solve engineering problems?

▲cbg0 5 hours ago | parent [-]

It potentially can, but you still need to build the thing in the physical world and test it under realistic conditions. Maybe I should have focused my post more around "materials engineering".

▲piyh 5 hours ago | parent | prev | next [-]

Plasma control is still unsolved

▲empath75 6 hours ago | parent | prev | next [-]

engineering problems are often just math problems.

▲patrick0d 6 hours ago | parent | prev [-]

the next YC call for proposals can include LEAN for building reactor walls that survive neutron damage