▲ Lio 3 hours ago

A national network of fridges uses quite a bit of energy to run. Cooling empty fridge space on that scale is a huge waste of energy and money.

Connecting them up to an integrated logistics system opens up big savings. You can start cooling only as a delivery is on the way and at temperature when it arrives.

Britain has historically had some of the best run supermarkets in the world. This is a way to pass savings on to customers.

It's one reason why fresh produce is generally cheaper in the UK than the USA even though the cost of energy is much higher in the UK.

▲ZnerflBerp 2 hours ago | parent [-]

Could this not be done with a local thermometer? What function requires reporting back to some global C&C for a fridge?

▲Lio 2 hours ago | parent [-]

No I don't think so. It's not so much just the reporting as the central control and coordination.

A local thermometer won't know that lory with an exact number of pallets is held up in traffic or what its ETA is.

An integrated logistics system can know where every lory is, what's on it and where it needs to go.

It can control the fridges for drop off along the way and can deal with changes in delivery schedule or on demand re-routing.

Imagine customer demand changes in one particular shop. In another one fridge isn't reaching temperature, re-routing a delivery will wastage whilst a servicing team is sent to fix it.