| ▲ | hunterpayne a day ago | parent | next [-] |
| Have you ever asked yourself why this is? There are two basic types of reasons why the UK nuclear industry does so poorly. The first reason are scientifically illiterate "activists" that delay and block construction. But this is only part of it. The other and possibly bigger part is that the UK doesn't build stock nuclear plants. They "Wallace and Grommet" things far too often. In this case, that means not building proven designs but instead building experimental ones. Specifically building high temp reactors which haven't been built before. Normally (at least in the US) we build pilot plants (think 1/10th the normal size, so 100MW or so) and then once we get the kinks worked out, we built the full size plant. In the UK they just built full sized experimental reactors. This is why the UK has so many problems with (the cost of) their nuclear plants. Had they built a stock design (like the French) they wouldn't have these problems. |
| |
| ▲ | mikeyouse a day ago | parent [-] | | The French are building Hinkley, and are financially responsible for a huge portion of it, so I don’t that having them involved is a panacea. |
|
|
| ▲ | nine_k a day ago | parent | prev | next [-] |
| What made the cost to balloon so much, and the timeline to set so huge a delay? Technical problems? Regulatory hurdles? Locals resisting? Running out of money? |
| |
|
| ▲ | stymaar a day ago | parent | prev [-] |
| Most of the Hinkley Point C and Sizewell C costs come from interests being paid in the high risk debt raised to build it. Unsurprisingly it turns out financing such a long term project on a 10% rate debt is not a good idea. (Keep in mind that this debt has been borrowed during ZIRP, where the baseline interest rates where near 0, this rate is just the premium that private actors are taking for the risk to see such a project being canceled for political reason). Of course the sensible way to do it would have been to finance it on long term public debt guaranteed by the British govt, who would then have born the burden of an hypothetical cancelation of the projects (and the cost per MWh would have been 4 times lower IIRC), but public is a forbidden word for the Tories. |