| ▲ | jacquesm a day ago | |||||||
Yes, soft start is the way to go. Also: proper industrial breakers allow for temporary overload. I have a couple of pieces of gear that have inrush currents well over the limit of a normal breaker so I put them on a slow one and now it is fine. https://onccy.com/how-to-choose-between-type-a-b-c-and-d-min... | ||||||||
| ▲ | margalabargala 17 hours ago | parent | next [-] | |||||||
> Also: proper industrial breakers allow for temporary overload Notoriously a crescent wrench makes an excellent 1000A slow blow fuse | ||||||||
| ||||||||
| ▲ | pseudohadamard 16 hours ago | parent | prev [-] | |||||||
Soft-start is in theory the way to go, but it's very dependent on the motor type, there's a whole pile of different methods required for induction motors depending on whether they're capacitor-start, permanent split capacitor, shaded-pole, etc, so you can do it in some cases by lowering the voltage, or with a VFD, or a VSD, or the old-fashioned way with a centrifugal switch but that requires very careful handling. If as the OP said it's running million-dollar equipment you probably don't want to monkey with it at that level. | ||||||||