| ▲ | californical 6 hours ago | |
Can we just have it as an additional data point, on top of what we should already know from where the train should be from switching history? If we get 99% accuracy, is that enough to check with an operator “specify which track you are in, left or right” when the measured value is different than the expected? | ||