| ▲ | Arubis 16 hours ago | |||||||
The regulatory overhead to grid-connect is a _significant_ portion of the price, both for the actual paperwork labor and because of the premium it imposes on the system components (you can't use inexpensive non-UL-listed panels) | ||||||||
| ▲ | benrutter 16 hours ago | parent | next [-] | |||||||
Is this really a thing in the US? At least in Europe, rooftop solar like OP mentioned doesn't require grid-connection? | ||||||||
| ||||||||
| ▲ | dyauspitr 11 hours ago | parent | prev [-] | |||||||
Net metering hasn’t been allowed in my county in more than two years so that can’t be it. | ||||||||