| ▲ | asdff 4 hours ago | |||||||
The thing with those jobs where its like 1 guy operating the skid steer and six guys watching with arms folded, is those other six guys are just waiting their turn to do something specialized on the job. The skid steer work is the limiting factor, and that idle labor is worth paying to have on call on site essentially for when the specific needed task is done. To an extent for sure, but that is the idea of more specialized jobs. There isn't always enough work in front of you to have a specialist work 100% 24/7 like some CPU, but you want them around for when there is work for them to do. | ||||||||
| ▲ | whatisthiseven 4 hours ago | parent [-] | |||||||
This is entirely caused by construction companies that take too many jobs and don't allocate sufficient equipment. They want to spread themselves and their equipment thin to have as many concurrent jobs as possible. | ||||||||
| ||||||||