| ▲ | jmb99 an hour ago | |
By the time my plan’s done I’m usually between 200 and 350k context. Even if keeping that around gives a performance bump for the implementation (which I haven’t noticed to be the case) it balloons the cost. I would much rather put everything in a plan file and start fresh. Plus, I usually plan with a more expensive model and guide implementation with a cheaper model (with smaller validation calls back to a more expensive model) | ||