Texas Data Center Map: See where data centers are operating or planned(kxan.com)
31 points by simonpure 2 hours ago | 24 comments
cobolcomesback 2 hours ago | parent | next [-]

This is just a rehash of the map already available at datacentermap.com (it’s literally cited as their source). Not sure what KXAN is adding here.

Also worth noting that a very loose definition of data center is used here that doesn’t fit the current colloquial usage of the term. One of the “data centers” listed in the middle of Austin, for example, is barely the size of a house and is actually just the switching infrastructure for a radio tower. Not every dot on this map is an energy-guzzling hyperscaler boogie man.

sublinear an hour ago | parent | next [-]

Totally agree. The story is similar for all the dots in the middle of nowhere and small towns. That's half the map!

If people are so curious, they should head on out there and see what the fuss is about. They're going to find a lot of sheds and random closets with a single rack at most.

Knowing how this state operates, I wouldn't doubt a lot of these ended up on the list for small business tax purposes or subsidies. That's a different and much less interesting news story, though.

Psillisp 2 hours ago | parent | prev [-]

I much prefer the KXAN presentation of the data and the map layer styles.

Did this claim to be a 'hyperscaler' map?

xnx 2 hours ago | parent | prev | next [-]

And here's a map of major water users in Texas: https://golfcoursebrowser.com/

culi 3 minutes ago | parent [-]

Despite the lobbying effort, it's still true that over 90% of data centers are not closed loop. Per-acre data centers use much more water.

More important politically, is that your water bill will absolutely go up faster with a new data center in town than with a new golf course. Dc's usually draw from a single pipe while golf courses and farmland spread it out. Also a golf course usually uses primarily greywater or recycled water.

The grievances about water usage are absolutely well-founded. Industry sockpuppets often like to push statistics about closed-loop data centers (which are less than 10% of all data centers) to fight back. Closed-loop data centers have their own drawbacks like drastically increased electricity usage and added pollution concerns due to the toxic sludge that needs to be bled out every month.

The golf course line has never been convincing. Find something new.

adjejmxbdjdn an hour ago | parent | prev | next [-]

Now do dairy operations…

One of the heaviest water consumers and a massive user of land (especially when considering the land needed to grow feed). And data centers aren’t creating lagoons of shit.

And that’s even before you get to the moral atrocity of dairy.

josefresco an hour ago | parent [-]

https://storymaps.arcgis.com/stories/cc02f97b1129447db2420eb...

It's a little dated but I'm sure it hasn't changed much since 2024.

Tulare County (CA), the Panhandle region (TX), and the Magic Valley (ID) consistently rank as the highest-density clusters for the largest individual dairy herds in the country.

Also: https://ever.ag/map-downloads

evan_ an hour ago | parent | prev | next [-]

I predict "data centers" are going to start being built but they'll say it's a distribution warehouse for motorcycle parts or a factory or something. There'll be a token amount of floor space set aside to manufacture pen cartridges but then there'll just be an incidental 200000 sq ft of server racks.

Actually I'm sure they're already doing that.

rpaik 2 hours ago | parent | prev | next [-]

How can locations be labeled secret (for 29 data centers)? Aren't there hearings or filings for proposed data centers?

bix6 2 hours ago | parent | next [-]

Government exists to serve corporations not individuals in this country. They can pretend these are confidential and have various cover to not release info as a result.

sublinear an hour ago | parent | prev [-]

Border patrol, law enforcement, FBI, etc. There's a few military bases as well. I'm not sure what else you're expecting in Texas.

If you look at google maps, the "secrets" will become a lot less mysterious.

mohamedkoubaa an hour ago | parent | prev | next [-]

Some of these are just office buildings with multiple companies. Are we really calling a rented space with servers a data center now?

gustavus an hour ago | parent | prev | next [-]

One question I've got is why Texas? It gets very warm there and DCs need cooling. Wouldn't like Wisconsin or Minnesota or Michian be cheaper. I mean Michigan's whole schtick is land of 1000 lakes, and that's not even considering Alaska which is massive, unpeopled, and colder than a nun's ruler?

I'm not saying for or against, I'm just curious why they are choosing Texas?

bonestamp2 21 minutes ago | parent | next [-]

It's easier to get permits in Texas than most other states, which is especially important for the power generation that some of these data centers are building.

darth_aardvark an hour ago | parent | prev [-]

It's not geography, it's politics. Low taxes, general amenability to big businesses, and low ecological restrictions.

culi 2 minutes ago | parent [-]

It's not even taxes. It's the fact that municipalities and cities are making deals with these companies to give them, e.g., 10 years of tax breaks to build there. If you live in Texas, you are subsidizing these companies

ActorNightly an hour ago | parent | prev | next [-]

My takeaway from this is apparently you can build a datacenter in a place where the weather reaches 110 degrees in the summer. AC has come a long way. I wonder what cost feasability of building essentially a biodome that is actively climate controlled that spans an entire town or city.

ChrisArchitect an hour ago | parent | prev | next [-]

How does this compare to the crowdsourced data included on https://www.brockovichdatacenter.com/ ?

polski-g 2 hours ago | parent | prev [-]

Some of these are pipe dreams. A Microsoft datacenter at 2.5MW, another at 2MW. There's no way they're going to get generation capacity for that load.

infecto 2 hours ago | parent | next [-]

Why is that a pipe dream? It’s BTM for at least one of the sites you are talking about. The only constraint, which is real, is availability of turbines but other than a delayed timeline i am not sure what’s a pipe dream.

bpodgursky an hour ago | parent | prev | next [-]

2.5 MW / 2 MW are tiny. I think you are confused.

convolvatron 2 hours ago | parent | prev [-]

are you off by a K? from the article - 'As of early August, ERCOT was considering more than 474 gigawatts of requests to connect to the Texas electric grid, about 90% of which came from data center projects.'

dylan604 an hour ago | parent [-]

Now I'm curious what the other 10% is.

culi a few seconds ago | parent [-]

The entire rest of society? Schools, hospitals, homes, businesses, etc