| ▲ | willcarkner 2 hours ago | ||||||||||||||||
yes, what was the utilization like? | |||||||||||||||||
| ▲ | cryo32 an hour ago | parent [-] | ||||||||||||||||
20-40% capacity. Reserve available. Turnaround same day on a board (2 layer). Next day 4 layer. Two days exotic (rogers etc). Pick, place, soldered 2 days or delivered to lab immediately after panel cut. If they had a fast production run in they could extend to 24 hours operation and triple base capacity. They did a fair bit of TH though which was manually stuffed and wave soldered which could slow stuff down considerably. | |||||||||||||||||
| |||||||||||||||||