| ▲ | mike_hearn 4 hours ago | ||||||||||||||||||||||
On Earth it has to be fossil fuels. With solar you can't do it. I haven't done the calculations myself so, full disclosure, AI work ahead. But I asked GPT 5.6 how big a solar and battery farm would have to be to power a one gigawatt datacenter such that it could ride out a few cloudy days in a row (this is far below the reliability bar). Its answer is you'd need an "absurdly large battery" and a solar farm of over 100 square kilometers, quite possibly up to over 200 square kilometers. And it would need to be built in the desert. Also, normal utility scale LiON battery sites are only meant to provide stabilization services for hours, not days. The problem is you have to overspec the solar farm quite a lot because it must not only be able to power a one gigawatt facility, but also generate more than that so it can recharge the battery packs during the day too. So this just doesn't work. You think datacenter permitting is bad when it only requires some on-site gas turbines? Imagine the difficulty of getting a 200 square kilometer solar farm over the finishing line. No, it's quite possible Elon is going to win this one. Regulation is expensive! He can just fire a constant stream of satellites into space. The constellation needed to provide a gigawatt of inferencing would be about the same size as today's Starlink system, well within the bounds of what he's proven can be done. The threat to space based datacenters isn't really the physics of it. It's the risk of a bubble pop that temporarily craters demand and/or an overbuild of terrestrial capacity. Outside of the software industry we don't see huge new blocks of inferencing demand, and OpenAI at least doesn't seem capacity constrained at all right now. | |||||||||||||||||||||||
| ▲ | bronson 4 hours ago | parent | next [-] | ||||||||||||||||||||||
Why restrict yourself to 100% solar? Solar augmented by grid is pretty great. Also, you very conspicuously avoided talking about the difficulty/impact of a 1GW datacenter in space. One might suspect your motives aren't as impartial as you seem to think. | |||||||||||||||||||||||
| |||||||||||||||||||||||
| ▲ | abirch 4 hours ago | parent | prev | next [-] | ||||||||||||||||||||||
How do you cool the data center in space cost effectively? Unfortunately in space there isn't a lot of material (air) to transfer the heat. | |||||||||||||||||||||||
| |||||||||||||||||||||||
| ▲ | bryanlarsen 3 hours ago | parent | prev [-] | ||||||||||||||||||||||
100 square kilometers sounds like a big area. And it is, in continental Europe or in an urban area. In Montana, it's enough space for a few hundred cows. In desert regions, it's worth even less. You can buy 100 square kilometres of unserviced desert land for ~$10M. | |||||||||||||||||||||||
| |||||||||||||||||||||||