Remix.run Logo
jeffbee 5 hours ago

Almost all of the site would have been open space, existing transmission corridors, an electric substation, and two flood control ponds they threw in to try to sweeten the deal by offsetting the new impermeable surfaces. The data halls are a small portion of the site.