I didn’t realize the scale of data centers in northern Nevada. I also find it hard to wrap my head around the scale involved. Right now I'm putting together a home server with 4x GPUs. Never having worked with a real server chassis before, I didn't really think the logistics through. It weighs over 100 pounds and requires two people to move. It had to be delivered on a pallet and unloaded with a forklift, way too big for UPS. Takes up my whole desk at the moment. Needs a 220V 30A outlet. If I stuffed it full of RTX6000s, it would draw about 6 kW. And this article talks about a 6 GW project, so that's... a million of these giant power-slurping boat anchors. There's a similar data center project in Utah which is also causing a lot of wailing and gnashing of teeth. That one is 9 GW. 1.5 million huge-ass (to me) 4U servers. This just seems nuts. | ||