consp 14 hours ago

That guarantee is not as much of a guarantee as stated in the media. You get a guarantee it will be planned at a certain time (as in looked at), not that it will be build. The cost of doing business is taking risks and mitigating them. There is a reason the nuclear plant in Borsele was build: an aluminium smelter. Maybe you should arrange for something similar as a datacenter (no politician will fall on a sword for that but you can try). The (original) power draw is about the same 80-100MW.