| ▲ | toomuchtodo 5 hours ago | ||||||||||||||||
France had to nationalize EDF due to the exorbitant cost of their nuclear fleet, and they cannot get a reactor built within reasonable capital costs. Spain plans to deprecate their remaining nuclear for renewables for similar reasons. California will achieve a low carbon generation profile for far cheaper than it cost France (refer to the Lazard LCOE data product I've cited in my other comment in this thread). EDF fleet upkeep will cost over 100 billion euros by 2035, court of auditors says - https://www.reuters.com/business/energy/edf-fleet-upkeep-wil... - November 17th, 2025 French utility EDF lifts cost estimate for new reactors to 67 billion euros - Les Echos - https://www.reuters.com/business/energy/french-utility-edf-l... - March 4th, 2024 Explainer-Why a French plan to take full control of EDF is no cure-all - https://www.euronews.com/next/2022/07/07/edf-nationalistion - July 7th, 2022 Spain’s Nuclear Shutdown Set to Test Renewables Success Story - https://www.bloomberg.com/news/articles/2025-04-11/spain-s-n... | https://archive.today/4fB7K - April 11th, 2025 (“Spain is a postcard, a glimpse into the future where you’re not going to need baseload generators from 8am to 5pm” with solar and wind providing all of the grid’s needs during that time, said Kesavarthiniy Savarimuthu, a European power markets analyst with BloombergNEF. Still, she said, there is a reasonable chance this goal may take longer than expected and “extending the life of the nuclear fleet can prove as an insurance for these delays.”) (My note: As of this comment, Spain has 7.12GW of nuclear generation capacity per ree.es, and assuming ~2GW/month deployment rate seen in Germany, could replace this capacity with solar and batteries in ~17 months; per Electricity Maps, only 15.45% of Spain's electrical generation over the last twelve months has been sourced from this nuclear: https://app.electricitymaps.com/map/zone/ES/12mo/monthly) | |||||||||||||||||
| ▲ | adev_ 3 hours ago | parent [-] | ||||||||||||||||
> France had to nationalize EDF due to the exorbitant cost of their nuclear fleet That's just wrong. EDF nuclear fleet is highly profitable with around 92TWh exported in 2025 and more than 5 Billions of benefits for the country and the company. https://www.sfen.org/rgn/le-nucleaire-en-chiffres-923-twh-de... The reason EDF had to be nationalized is because the government used the company as a "price shield" to protect consumer against energy price rise on the European market in 2022 with a mechanism named TRV (Tarif Régulé vente). That digged up EDF dept tremendously. > Spain plans to deprecate their remaining nuclear for renewables for similar reasons Span deprecated their nuclear government because their current Socialist government is aligned with Ecologists that are, like everywhere in Europe, antinuclear. Additionally, the lack of spinning generator in Spain is currently partially what caused the Blackout in Spain in 2025 due to a lack of inertia in the system. > EDF fleet upkeep will cost over 100 billion euros by 2035, court of auditors says This is over 25 years and will prolong-ate the lifetime of the 56 reactors by 20 more years. These produce 70% of the country need in electricity. In comparison, the German energiewende cost 400 billions for 37% of electricity of 2025 produced by solar and wind. With production medium that will need to be entirely renewed in 20 years. > California will achieve a low carbon generation profile for far cheaper than it cost France (refer to the Lazard LCOE That is also wrong. Because LCOE calculation does not take into consideration the price of the grid consolidating necessary for renewable nor the necessity of backup generation in case of dunkleflaute. | |||||||||||||||||
| |||||||||||||||||