| ▲ | zahrevsky 2 hours ago | |
The system could be set up to automatically refund, if your PR wasn't checked for over $AVERAGE_TIME_TO_FIRST_REVIEW$ days. The variable is specific to the project, and even can be recalculated regularly and be parameterized with PR size. | ||