| ▲ | p0pularopinion 5 hours ago | ||||||||||||||||
Nuclear does not cause prices to be lower. Putting that aside, political discourse here in Germany was "interesting" to say the least. The shift to renewables started off pretty well in the early 2010s before it came to a grinding halt thanks to some wierd debates around the topic. For the past few years, buildout of solar has been remarkably fast, especially considering the slow pace of other projects. In 2025, 16.4 GW of solar power went live. The biggest issue that drives prices here is the grid. New high voltages transmission lines have faced intense local oppsition, so transmision between North and South is limited, which is problematic given the focus of the north on (offshore) wind and the south on solar PV. Since Germany is a single electricity price zone, the low to negative electricity prices from wind turbines do not reflect the reality of grid capabilities, resulting in significant redispatch costs. The solution would be obvious. Split Germany into n electicity price zones (with n>1). However, there is a lot of political opposition, specifically from the conservative CDU/CSU against this. So yeah, Germany is struggling with relatively expensive electrcity prices, complaining about it, but refusing to implement a borderline free solution for it. | |||||||||||||||||
| ▲ | coredev_ 3 hours ago | parent | next [-] | ||||||||||||||||
Nuclear that was built a long time ago would probably have lowered the prices in DE right now, if they weren't shut down. I understand that building new ones right now makes little sense. | |||||||||||||||||
| |||||||||||||||||
| ▲ | Moldoteck 3 hours ago | parent | prev | next [-] | ||||||||||||||||
Nuclear was cheapest firm power in the german merit order. So yes, nuclear does have an impact, especially if it outplaces higher cost units There is a lot of opposition because zone split would mean erasing southern industry and I may be wrong, but southern regions are pumping most of the money into state budget. Cutting those means cutting own legs. | |||||||||||||||||
| ▲ | MadDemon 4 hours ago | parent | prev [-] | ||||||||||||||||
The high voltage DC transmission lines from north to south are being built right now and for example SuedLink is expected to be operational in 2028. Their transmission capacity will be more than enough. Why would you split Germany into electricity zones now, if in a few years the transmission problem will largely be fixed? | |||||||||||||||||