Remix.run Logo
postepowanieadm 9 hours ago

I may tell from Polish perspective - loosely speaking: Germany and Austria used to share single bidding zone: electricity was produced by wind at the north and then consumed by factories at the south. The problem: no sufficient grid connection - Polish and Czech grids were used instead, what caused major problems - loop flows. It lasted from 2001 to 2018.

Unification needs to be real, including grids, not on paper only.