| ▲ | tucnak 9 hours ago | |
If they were serious about helping us, they would bring boiler, turbine, and transformer parts. > The project, underway since the end of 2023, is focused on the renovation and energy upgrade of a five-storey, 60-apartment block. [..] Heat pumps and solar energy now supply a large residential building in full, a first for Ukraine. Böhling urges: “Solutions like this should be prioritised over gas heating in EU-funded reconstruction.” Not the first. I don't think some people realise this, but Ukraine is a country with highly-modernised, strong, and well spread-out industrial base. This is why it took the invaders three whole years to seriously damage our CHP infrastructure to the point it cannot be repaired in a timely manner. And most new apartment blocks are built with heat pumps, geothermal anyway. Some smaller ones (such as the 5-story one they're taking about) were being retrofitted by housing cooperatives due to favourable economics of it. We are not third-world; most existing apartment blocks in all major cities are largely reliant on vast, redundant CHP infrastructure for power distribution and centralised heating. THAT is a solved problem. What we need is more air defense platforms and replacement parts that we cannot easily manufacture, in numbers. | ||