| ▲ | jobs_throwaway 8 hours ago | |||||||
TMSC's Arizona fab is up and running producing 4nm chips There's ~a dozen in the works or under construction TMSC plans to have 2-3nm fabs operational in the next 2-3 years So we're 2-3 years behind the standard (currently 2nm), and further behind on the bleeding edge sub-2nm fabs | ||||||||
| ▲ | techgnosis 8 hours ago | parent | next [-] | |||||||
Don't forget Intel. They are producing chips on 18A right now, with 14A up next. | ||||||||
| ▲ | alt227 5 hours ago | parent | prev [-] | |||||||
> TMSC's Arizona fab is up and running producing 4nm chips Are the majority of the staff still shipped in from Asia? | ||||||||
| ||||||||