| ▲ | pavon 2 hours ago | |
Yes, the replacements for this equipment has been around for a long time. The Propulsion and Structural Test Facility was built at Marshall in 1957 and used for design testing of the Saturn engines, and by 1966 the A1 test stand was built at Stennis, to perform production qualification of Saturn engines. And unlike the PSTF, the A1 and A2 test stands at Stennis have been maintained over the years, and continue to be functional today most recently being used to test the new RS-25 engine design that the SLS will use when we are out of SSMEs. | ||