| ▲ | microtonal 9 hours ago | |
Even when the Dutch offered to pay to have a broken bridge upgraded, the Germans turned down the offer, leaving plans for their old, outdated single track bridge in place. Or how a bridge Friesenbrücke was hit by a ship in 2015 and the replacement is still under construction (supposed to be finished in 2026 now). As a result no train could drive between Groningen and Leer. To make the whole thing more sad, the replacement bridge has to be open 40 minutes every hour because a shipbuilder has convinced the Wasserstraßen- und Schifffahrtsamt to do so, severely constraining train traffic. No one on the other side of the border understands why they haven't built a bridge that would allow ships to pass through without opening the bridge. This kind of nonsense is very typical of German bureaucracy (I have lived there). Nobody has ambitions and nobody wants to stick their neck out. | ||