There's always a possibility that something implicit to the early model structure causes it to explode later, even if it's a well known, otherwise stable architecture, and you do everything right. A cosmic bit flip at the start of a training run can cascade into subtle instability and eventual total failure, and part of the hard decision making they have to do includes knowing when to start over.
I'd take it with a grain of salt; these people are chainsaw jugglers and know what they're doing, so any sort of major hiccup was probably planned for. They'd have plan b and c, at a minimum, and be ready to switch - the work isn't deterministic, so you have to be ready for failures. (If you sense an imminent failure, don't grab the spinny part of the chainsaw, let it fall and move on.)