Remix.run Logo
tremon 4 hours ago

If you're referring to this quote (excerpted from the AVHerald article linked elsewhere in the thread), I don't think so:

> At the time of the accident, N259UP had accumulated a total time of about 92,992 hours and 21,043 cycles [..] A special detailed inspection (SDI) of the left pylon aft mount lugs would have been due at 29,200 cycles and of the left wing clevis support would have been due at 28,000 cycles

This isn't talking about replacement, only inspection; and it wasn't going to happen in the near future: 7k cycles at four flights/day means inspection is due in 5 years.