| ▲ | DannyBee 7 hours ago | |
While the US is still very manual at panel building, Europe is not. So outside of waiting time, I can go from eplan to "send me precrimped and labeled wires that were cut, crimped, and labeled by machine and automatically tested to spec" because this now exists as a service accessible even to random folks. It is not even expensive. | ||