▲ | throwaway173738 13 hours ago | |||||||
Energy projects are just a variation of a real estate project. As you might know, a lot of the difficulty in mass producing buildings isn’t making the parts but preparing the site to receive the parts. There’s probably 5 or 10 companies in your vicinity that can ship you prefabricated walls and floors for a house. But you still have to have the plans engineered for the exact piece of land you plan to put it on. The same will be true for every windmill and solar farm. Studying the site and planning the build are unique to each building and limit how fast you can go anyway. | ||||||||
▲ | AnthonyMouse 11 hours ago | parent | next [-] | |||||||
Sounds like a racket. | ||||||||
| ||||||||
▲ | potato3732842 6 hours ago | parent | prev [-] | |||||||
>But you still have to have the plans engineered for the exact piece of land you plan to put it on. >The same will be true for every windmill and solar farm. No, you don't. That's purely a figment of how successful the civil engineering lobby was at regulatory-capturing their way into the process. The people who build buildings and windmills know what kind of foundations they need. If you have even a ballpark estimate of your site conditions they will happily tell you approximately what you'll need to do. An extra inch of concrete here or there or a foot less of pile spacing or an extra few passed with the dozer costs basically nothing. The only reason you see people designing things to the bare minimum is that when you're being forced to pay a engineer to punch in numbers either way it makes sense to take advantage of that and make them tell you what the bare minimum is so you can at least save a bit on actual construction costs. You think you hate crony capitalism or the micromanaging nanny state or whatever you want to call it now. Just wait until you engage in any kind of project that doesn't benefit from all the exemptions that residential does. | ||||||||
|