▲ | zitterbewegung 4 days ago | ||||||||||||||||
To put this into perspective this datacenter would have the land area of Monaco (740 acres) given assumptions of a 80kW/rack per case. | |||||||||||||||||
▲ | oezi 4 days ago | parent | next [-] | ||||||||||||||||
Monaco is so tiny it fits into Berlin's Tempelhofer Feld (a circular park inside the city). | |||||||||||||||||
| |||||||||||||||||
▲ | vessenes 4 days ago | parent | prev | next [-] | ||||||||||||||||
So, basically a single BYD factory | |||||||||||||||||
▲ | dguest 4 days ago | parent | prev | next [-] | ||||||||||||||||
Monaco is 2 km^2 [1]. I'm confused because if I assume each rack takes up 1 square meter I get a much smaller footprint: around 12 hectares or 17 football fields. And that assumes that the installation is one floor. I don't know much about data centers but I would have thought they'd stack them a bit. Am I the only person who had to look up how big Monaco was? [1]: https://en.wikipedia.org/wiki/Monaco [2]: https://www.wolframalpha.com/input?i=10+GW+%2F+%2880kw+%2F+m... | |||||||||||||||||
| |||||||||||||||||
▲ | ahmeneeroe-v2 4 days ago | parent | prev | next [-] | ||||||||||||||||
To put Monaco in perspective, the US could fit 4.8M Monacos | |||||||||||||||||
| |||||||||||||||||