▲ | paulcole 9 hours ago | ||||||||||||||||
Engineer does 40 outreaches in a week and says the results are “not that amazing” lol. If I said that I coded for 15 minutes a day for a week and wasn’t impressed by the results, what would an engineer say? | |||||||||||||||||
▲ | wahnfrieden 9 hours ago | parent [-] | ||||||||||||||||
I do 40 personalized outreaches in two hours. Edit: I shared a couple details in my other reply under this post | |||||||||||||||||
|