▲ | ponector 2 days ago | |
Three points there: 1. Power of Syberia 1 throughput is not fully utilized. 2. China pays half of the EU price. 3. Power of Syberia 2 not be build in the near future. It's not the deal to actually do something. It's too continue further discussion. |