Remix.run Logo
conception 2 days ago

I tell it to generate a todo.md file with hyper atomic todos each requiring 20 loc or less. Then have it go through that. If the change is too big, generate phases (5-25) and then do the todos for each phase. That plus some sort of reference docs/high level plan keeps it going along all right.