▲ | glonq 7 months ago | |
A PLC controller deals with anything that requires tight timing, so the Go portion is mostly higher-level control of the system and states. | ||
▲ | AstralStorm 7 months ago | parent [-] | |
So only high level non-safety-critical code, I see. I hope someone properly checked that no safety properties depend on Go there. I bet nobody actually did so... |