Remix.run Logo
glonq 7 months ago

A PLC controller deals with anything that requires tight timing, so the Go portion is mostly higher-level control of the system and states.

AstralStorm 7 months ago | parent [-]

So only high level non-safety-critical code, I see.

I hope someone properly checked that no safety properties depend on Go there. I bet nobody actually did so...